
Odometer
133935.0

Condition
ENGINE START PROGRAM

Certificate
S1

Has Keys
Yes
1998 JEEP CHEROKEE SPORT 1998, VIN: 1J4FJ68S5WL146038 - Auto history
Vehicle
VIN: 1J4FJ68S5WL146038
Make
JEEP
Model
GRAND CHER
Year
1998
Model Variant
CHEROKEE S
Series
-
Vehicle Type
AUTOMOBILE
Color
GREEN
Transmission
MANUAL
Fuel Type
GAS
Cylinders
6
Engine
4.0L 6
Drive
4x4 w/Rear Wheel Drv
Plant Country
UNITED STATES (USA)
Plant City
TOLEDO
Plant Company
Toledo Assembly # 1
Plant State
OHIO
LOT INFORMATION
#47034884
Lot number
47034884
VIN
1J4FJ68S5WL146038
Location
WALDORF, MD
Retail value
5874
Estimated Repair Cost
5874
Auction
COPART
Condition
ENGINE START PROGRAM
Sale Doc
CERT OF SALVAGE > 75% DAMAGE
Primary Damage
TOP/ROOF
Secondary Damage
MECHANICAL
Odometer
133935
Has Keys
Yes
HIDE LOT
We do respect privacy rights of every person. Therefore if you do not want to show the lot you have purchased on our website, you can hide it.
1979 JEEP CHEROKEE S 1979 VIN: J9M17NN143297
1986 JEEP CHEROKEE LAREDO 1986 VIN: 1JCWL7846GT152101
1987 JEEP CHEROKEE LAREDO 1987 VIN: 1JCML7840HT092390
1987 JEEP CHEROKEE LAREDO 1987 VIN: 1JCML784XHT008124
Vin-based Vehicle Auction: 1J4FJ68S5WL146038
1998 JEEP CHEROKEE SPORT 1998 in GREEN at copart Auction
This 1998 1998 JEEP CHEROKEE SPORT with a 4.0L 6 engine in GREEN is up for auction at copart. It's listed under auction number and is scheduled for 2024-04-19 in the WALDORF, MD.
Key highlights of the auction , conducted at the WALDORF, MD branch, include:
- Vehicle sales history by vin: 1J4FJ68S5WL146038
- Vehicle damage: TOP/ROOF
- Vehicle condition: ENGINE START PROGRAM
- Vehicle mileage: 133935.0 mi / actual
- Vehicle document: CERT OF SALVAGE > 75% DAMAGE
This page also provides detailed auction information, technical specifications of the vehicle, photographs, videos, and a 360-degree panoramic view. For similar copart auction listings of 1998 JEEP CHEROKEE SPORT vehicles, visit this link.